﻿{"id":169,"date":"2013-02-13T09:02:40","date_gmt":"2013-02-13T09:02:40","guid":{"rendered":"http:\/\/lloyd-alman.com\/?page_id=169"},"modified":"2022-08-27T11:11:25","modified_gmt":"2022-08-27T06:41:25","slug":"active-projects","status":"publish","type":"page","link":"https:\/\/lloyd-alman.com\/?page_id=169","title":{"rendered":"Ongoing Projects"},"content":{"rendered":"<h4><a href=\"http:\/\/lloyd-alman.com\/wp-content\/uploads\/2013\/02\/010.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1994\" title=\"010\" src=\"http:\/\/lloyd-alman.com\/wp-content\/uploads\/2013\/02\/010.jpg\" alt=\"\" width=\"448\" height=\"336\" srcset=\"https:\/\/lloyd-alman.com\/wp-content\/uploads\/2013\/02\/010.jpg 448w, https:\/\/lloyd-alman.com\/wp-content\/uploads\/2013\/02\/010-300x224.jpg 300w\" sizes=\"auto, (max-width: 448px) 100vw, 448px\" \/><\/a><\/h4>\n<h4><\/h4>\n<h2>Main active projects of Lloyd Alman<\/h2>\n<p>&nbsp;<\/p>\n<div id=\"tbldiv\">\n<table class=\"contentTbl\" width=\"570\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<th>\n<h3>Clients<\/h3>\n<\/th>\n<th>\n<h3>Projects<\/h3>\n<\/th>\n<\/tr>\n<tr>\n<td width=\"335\" height=\"66\">&nbsp;Jahanpars Engineering and Construction &amp; DRG OIL<\/td>\n<td width=\"382\">Provision of Third Party Inspection Services for Basic and Detail Engineering Documents of<br \/>\nAboozar Offshore Complex Development Project<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Arya Sasol Polymer Co.<\/td>\n<td width=\"382\">RBI AIM Implementing &amp; Operating AIM System<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Bina Consulting Engineers Co.<\/td>\n<td width=\"382\">Inspection Service in<br \/>\nSirri Island, On shore and Offshore Gas Compression Units Project<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">CNPCI<\/td>\n<td width=\"382\">Provision of Third Party Inspection for North Azadegani Oilfield in Iran<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Daelim, Sazeh, Kayson, IIND (JV)<\/td>\n<td width=\"382\">TPIA for SPGD Phase 12, EPC 2 &#8211; Onshore Facilities<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Deep Offshore Technology Co. (DOT)<\/td>\n<td width=\"382\">MWS<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Dena Sanat Co.<\/td>\n<td width=\"382\">Provision of Inspection Services in Polythylene Pipes for SPGD 19<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Dor Riz Engineering Co.<\/td>\n<td width=\"382\">Third Party Authority &amp; Certification Services &#8211; Phase 12<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Farayand &amp; Energy (FARAN)<\/td>\n<td width=\"382\">Inspections During the Construction in SPGD of phases 13\u060c17\u060c18\u060c22\u060c23\u060c24<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">GAMMA Co.<\/td>\n<td width=\"382\">Third Party Authority &amp; Certification Services &#8211; Phase 12<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Green Refinement Co.<\/td>\n<td width=\"382\">TPI Services for Equipment &#8211; China<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Green Refinement Co.<\/td>\n<td width=\"382\">TPI Services for Equipment &#8211; India<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">IOEC<\/td>\n<td width=\"382\">Provision of Third Party Agancy for Inspection of Pipeline Coating Activities 15 &amp; 16<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">IOEC<\/td>\n<td width=\"382\">Provision of TPI Services and works SPGD Project phases 17 &amp; 18<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">IOEC<\/td>\n<td width=\"382\">Provision of Inspection Services During of SPD12 Topsides &amp; Ancillaries &#8211; Phase 12<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">IOEC<\/td>\n<td width=\"382\">Provision of TPI Services and Works in SPGD 17 &amp; 18<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">IOEC<\/td>\n<td width=\"382\">MWS Services in SPGD phase 12 Pipeline Project<\/td>\n<\/tr>\n<tr>\n<td height=\"66\">IOEC<\/td>\n<td width=\"382\">TPI Services for Offshore Structure Installation<br \/>\nof Phases 12,15,16,17,18,19,20,21 of SPGD and Foroozan Oil Field<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">IOEC<\/td>\n<td width=\"382\">MWS services in SPGD phases 17 &amp;18 Pipe Installation Operation<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">IOEC<\/td>\n<td width=\"382\">TPI for Pipeline Installation Operations of SPGD 17 &amp; 18<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">IOEC<\/td>\n<td width=\"382\">TPI of CW Coating Application and Load out the Pipes of Phase 14 SPGD<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">IOEC<\/td>\n<td width=\"382\">Provision of TPI Services and works within Fabrication of<br \/>\nplatforms phases 20 &amp; 21 SPGD<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">IOEC<\/td>\n<td width=\"382\">TPI of Concrete Weight Coating Application and Load Out the Pipes of Phase 19,20,21<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">IOEC<\/td>\n<td width=\"382\">TPI of Onshre Pipe lying and Concrete Support Fabrication of SPGD Phase 14<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">IOEC<\/td>\n<td width=\"382\">TPI Pipelying &#8211; Phase 19<\/td>\n<\/tr>\n<tr>\n<td height=\"66\">IOEC<\/td>\n<td width=\"382\">TPI for Hook-Up, Pre-Commissioning and Commissioning Operation of SPD. 23 &amp; SPD 24<br \/>\nSPGFD Project Phase 17 &amp; 18<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Iran International General Contractor Co. (IGC)<\/td>\n<td width=\"382\">Skid Beam and Quay Wall, Project<br \/>\nPlan Approval &amp; Supervision During Construction<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Iran International General Contractor Co. (IGC)<\/td>\n<td width=\"382\">Foroozan Engineering Document Reviewing, Project Plan Approval<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Iran Shipbuilding &amp; Offshore Industries Complex Co. (ISOICO)<\/td>\n<td width=\"382\">Classification of dry-dock<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Iran Shipbuilding &amp; Offshore Industries Complex Co. (ISOICO)<\/td>\n<td width=\"382\">Certification &amp; Warranty Survey Hendijan Renovation and Development<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Iranian Offshore Oil Company (IOOC)<\/td>\n<td width=\"382\">Inspection of Turbine Repairing<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Iranian Oil Terminal Co. (IOTC)<\/td>\n<td width=\"382\">TPI Services for Equipment inside &amp; Overseas<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">ISOICO &amp; SAFF<\/td>\n<td width=\"382\">Third Party &amp; Marine Warrenty Inspections\/Services phases 15 &amp; 16<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Jondishapoor<\/td>\n<td width=\"382\">Inspection of Goods and Equipment Installation<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Kish Petroleum Engineering<\/td>\n<td width=\"382\">Drilling Rig Inspection in SPGD Phases 20-21<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Mahdin Industrial<\/td>\n<td width=\"382\">Inspection During Condtruction in SADRA &amp; ISOICO Projects<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Mashinsazi Tasha<\/td>\n<td width=\"382\">TPI overseas<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Naft Saze Qeshm Co. &amp; Saff Rosmond<\/td>\n<td width=\"382\">Supervision During Construction of Farzad Jacket<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Nardis Co.<\/td>\n<td width=\"382\">Inspection Services<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">NASR Consortium<\/td>\n<td width=\"382\">Inspection for SPGD 12 &#8211; Phase 12 &#8211; EPC 1<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">National Iranian Drilling Co. (NIDC)<\/td>\n<td width=\"382\">Provision of Technical Inspection Services &amp; Issuance of the Statutory<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Oceanic Marine Contractor OMC Ship Management<\/td>\n<td width=\"382\">MWS Services for the Inspection of Narge INTERMAC 268<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">OIEC<\/td>\n<td width=\"382\">Inspection of Purchased Material &amp; Construction Activities<br \/>\nSPGD Phases 20 &amp; 21 &#8211; Onshore &amp; Drilling Facilities<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">OIEC<\/td>\n<td width=\"382\">TPA for Inspection of Purchased Materials<br \/>\nOnshore Facilities &#8211; SPGD Phases 17&amp;18<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Petro Barasan<\/td>\n<td width=\"382\">For Supervision During Construction of Development of SOROOSH C9-15 Wells Project<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Petro Barasan<\/td>\n<td width=\"382\">Design Verification of Development of Soroosh C9-15 Wells Project<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Petro Omid Asia Co.<\/td>\n<td width=\"382\">Inspectionof Land Oil Drilling Rig<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Petro Sina Arya Co.<\/td>\n<td width=\"382\">Inspection ans Certification Services for SPGD Phases 22,23,24<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Petropars Aria Kish Operation (POMC)<\/td>\n<td width=\"382\">Sales of Software<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Petropars Iran Co.<\/td>\n<td width=\"382\">Inspection and Cerifiying Services (TPA) for Onshore Facilities inSPGD Phase 19<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">PIDECO<\/td>\n<td width=\"382\">TPI<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">PTK<\/td>\n<td width=\"382\">TPI inside &amp; overseas<\/td>\n<\/tr>\n<tr>\n<td height=\"66\">SAFF ROSMOND Engineering &amp; Management Co.<\/td>\n<td width=\"382\">Review and Apprial of Design Engineering and Installation Documents<br \/>\nTwo Wellhead Platforms (Jackets) for Hengam Field Project<\/td>\n<\/tr>\n<tr>\n<td height=\"66\">SAFF ROSMOND Engineering &amp; Management Co.<\/td>\n<td width=\"382\">Review and Apprial of Design Engineering and Installation Documents<br \/>\nJackets for Arash Field Project<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">SAFF ROSMOND Engineering &amp; Management Co.<\/td>\n<td width=\"382\">Review and Apprial of Design Engineering and Documents of<br \/>\nFARZAD Jacket<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Sanayeh Daryaee Iran (SADRA)<\/td>\n<td width=\"382\">Plan Approval &amp; Engineering Consultancy Services &#8211; Skid way<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Sanayeh Daryaee Iran (SADRA)<\/td>\n<td width=\"382\">Inspection of Goods and Provision of construction &#8211; MWS<br \/>\nSPGD13,17,18,22 &amp; 24 and Ilam<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Sanayeh Daryaee Iran (SADRA)<\/td>\n<td width=\"382\">TPI of phases 13\u060c17\u060c18\u060c 22 &amp;&nbsp; 24<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Sanayeh Daryaee Iran (SADRA)<\/td>\n<td width=\"382\">Plan Approval &amp; Supervision on Performance HPA Project<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Sepehr Rosmond Engineering &amp; Construction Co.<\/td>\n<td width=\"382\">Verification of Design Enginnering &amp;<br \/>\nInstallation Engineering for One Jacket<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Sepehr Rosmond Engineering &amp; Construction Co.<\/td>\n<td width=\"382\">Supervision During Construction of SPD12 E Jacket<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Shiraz Petrochemical<\/td>\n<td width=\"382\">&nbsp;RBI<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Sinopec<\/td>\n<td width=\"382\">Provision of Onsite Inspection Services<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Sinopec<\/td>\n<td width=\"382\">Provision of Third Party Material and Equipment Inspection Services<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Sinopec<\/td>\n<td width=\"382\">CTR-Material Selection Study for Piping and Valve<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Tasdid Offshore Development Co. (TASDID)<\/td>\n<td width=\"382\">Plan Approval, TPI &amp; MWS<br \/>\nReshadat Pipeline and Power Opto Cable Project<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Tasdid Offshore Development Co. (TASDID)<\/td>\n<td width=\"382\">Plan Approval, TPI &amp; MWS<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Tasdid Offshore Development Co. (TASDID)<\/td>\n<td width=\"382\">Plan Approval Submarine Pipelines Renovation<br \/>\nfor Aboozar &amp; Nowrooz Fields Project<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Tasdid Offshore Development Co. (TASDID)<\/td>\n<td width=\"382\">Engineering Approval of Foroozan Field Development<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Tehran Berkeley<\/td>\n<td width=\"382\">Design Review for upgrading of Bahregan Crude Oil Terminal<\/td>\n<\/tr>\n<tr>\n<td height=\"44\">Tehran Jonoob<\/td>\n<td width=\"382\">Inspection During Condtruction and PSI of all Equipmens<br \/>\nand Materials in Yasavaran Oil Filed Development<\/td>\n<\/tr>\n<tr>\n<td height=\"22\">Tehran Wastewater<\/td>\n<td width=\"382\">TPI of Equipment<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Main active projects of Lloyd Alman &nbsp; Clients Projects &nbsp;Jahanpars Engineering and Construction &amp; DRG OIL Provision of Third Party Inspection Services for Basic and Detail Engineering Documents of Aboozar Offshore Complex Development Project Arya Sasol Polymer Co. RBI AIM Implementing &amp; Operating AIM System Bina Consulting Engineers Co. Inspection Service in Sirri Island, On [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":143,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-169","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/lloyd-alman.com\/index.php?rest_route=\/wp\/v2\/pages\/169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lloyd-alman.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lloyd-alman.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lloyd-alman.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lloyd-alman.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=169"}],"version-history":[{"count":23,"href":"https:\/\/lloyd-alman.com\/index.php?rest_route=\/wp\/v2\/pages\/169\/revisions"}],"predecessor-version":[{"id":2460,"href":"https:\/\/lloyd-alman.com\/index.php?rest_route=\/wp\/v2\/pages\/169\/revisions\/2460"}],"up":[{"embeddable":true,"href":"https:\/\/lloyd-alman.com\/index.php?rest_route=\/wp\/v2\/pages\/143"}],"wp:attachment":[{"href":"https:\/\/lloyd-alman.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}